Skip to content
Market file / France

France proves the feasibility engine.

Deterministic, auditable feasibility from published planning rules — validated by architects, traceable to source.

Every PLU, cadastre and architectural conclusion remains To Verify until the official source and professional review are attached.
01

PLU & zoning interpretation

The engine reads the published PLU: emprise au sol, gabarit, height limits, setbacks and use constraints — interpreted as rules, cited as sources.

02

Buildable capacity

Massing envelopes and buildable floor area computed deterministically from the zoning parameters — the same inputs always produce the same answer.

03

Rough construction cost

Cost bands derived from transparent baselines, labelled indicative until validated on the file.

04

Planning-risk flags

Heritage overlays, risk plans and procedural constraints flagged early — before capital is committed, not at the permit desk.

05

Architect-supervised validation

A licensed architect reviews and signs the feasibility gate. Rule-based math, not an LLM guess — then a professional’s signature on top.

06

Auditable outputs

Every number is traceable: the rule it came from, the document that published it, the reviewer who validated it.